Climate & Environment
SpaceX Receives Texas Air Permit for $24 B Boca Chica Power Plant Ahead of Governor‑Elect Hinojosa’s Inauguration

Elon Musk’s SpaceX has obtained an air‑pollution permit from Texas for a natural‑gas power plant at Boca Chica, a few weeks before Democratic Governor‑Elect Gina Hinojosa takes office. The plant is part of a proposed supercomputing complex east of Brownsville. Starbase estimates that the initial phases of the power plant and computing facility will cost about $24 billion.
The Texas Commission on Environmental Quality issued three air permits last week after lifting a pause on permits for data‑center projects. In addition to SpaceX, the approvals covered a power plant that would supply CloudBurst’s data center near San Marcos and an Atlas Energy Solutions plant northeast of Abilene. Before issuing the permits, outgoing Republican Governor Greg Abbott’s office told the agency that the state’s grid operator had finished gathering information on how data centers could affect local communities.
The permits give developers an opening before Texas lawmakers return in January. Hinojosa, the first Democrat elected Texas governor since 1990, campaigned on pausing new data‑center development, ending tax breaks for the industry and giving local communities more say over where projects are built. Abbott had already moved to tighten oversight before the election, calling on developers to cover their own costs, secure their own water supplies and protect the power grid.
SpaceX still has a local decision ahead. Starbase commissioners are scheduled to hold a public hearing on December 9 on a proposed property‑tax break for the project, which would occupy about 444 acres near the Port of Brownsville.
Developers are building their own power plants because long waits for grid connections are a factor. The Electric Reliability Council of Texas was weighing more than 474 gigawatts of connection requests in August. By September, 204 projects totaling 66.4 gigawatts had provisionally qualified to move forward with their initial power requests. Another 158 projects, representing 127.9 gigawatts, qualified for further study and could face longer waits or receive less power than requested. Texas accounts for nearly half the roughly 90 gigawatts of planned capacity across 59 U.S. data centers looking to generate their own power, according to Cleanview data cited by the Financial Times. The state’s natural‑gas supplies and pipeline network make that option attractive. But tighter rules could change where the next projects go. John Carrington, chief executive of generator supplier ERock, told the Financial Times that Arkansas, Oklahoma and West Virginia were courting developers.