India

US Supply Ship Wally Schirra Arrives at Chennai Shipyard for Repairs

By

US Supply Ship Wally Schirra Arrives at Chennai Shipyard for Repairs

The US Navy’s supply ship USNS Wally Schirra arrived at L&T’s Kattupalli shipyard near Chennai on Friday for repairs. The vessel is being serviced under the India‑US Master Ship Repair Agreement (MSRA) signed in 2023. This marks the fifth US naval vessel to undergo repairs at Kattupalli. The MSRA institutionalised cooperation after earlier repairs of USNS Charles Drew (August 2022), USNS Matthew Perry (March 2023) and USNS Salvor (July 2023). L&T’s shipyard signed the agreement with the US Navy in April 2023, enabling it to conduct voyage repairs of US naval vessels. USNS Charles Drew returned to Kattupalli for repairs in December 2024. The external affairs ministry said the arrival of Wally Schirra “underscores India’s efforts to facilitate international ship‑repair operations, strengthen maritime industrial cooperation and create an enabling environment for greater utilisation of Indian shipyards.” It added that India’s strategic location, expanding shipyard infrastructure, skilled workforce and growing technical capabilities position it to become a hub for ship repair and maintenance across the Indo‑Pacific and beyond. The ministry also noted that Wally Schirra is the first US naval vessel to arrive for repairs following the implementation of a revised Standard Operating Procedure that facilitates the entry and exit of ship crew, a whole‑of‑government effort involving the external affairs ministry, home ministry, defence ministry, Bureau of Immigration and the Department of Defence Production.

Frequently asked questions

What is the India‑US Master Ship Repair Agreement?

It institutionalised cooperation after earlier repairs, signed in 2023, enabling L&T’s Kattupalli shipyard to conduct voyage repairs of U.S. naval vessels.

Which U.S. naval vessels have been repaired at Kattupalli shipyard?

USNS Charles Drew (August 2022, December 2024), USNS Matthew Perry (March 2023), USNS Salvor (July 2023), and USNS Wally Schirra (this arrival).

Why is Wally Schirra’s arrival significant?

It is the first U.S. naval vessel to arrive for repairs after a revised Standard Operating Procedure that facilitates crew entry and exit, part of a whole‑of‑government effort.

Related stories